Final report

In response to the consulation that was carried out in November 2023, some changes have been made to the scheme in response to the feedback we received. These changes include moving the location of the new tree closer to the existing kerb to improve visibility, and lengthening the new double yellow lines to allow for loading and parking when a valid blue badge is displayed (see drawing below). The scheme will not result in the loss of any dedicated marked parking bays on Fairbridge Road, or result in any changes to access in and out of Fairbridge Road.

Construction is expected to begin Monday 18 March 2024, between the hours 8am and 6pm Monday to Friday and 8am and 1pm on Saturday, lasting one week.


During these works, an eastbound only road closure will be in place on Fairbridge Road east of Charles Street, with no through route from Holloway Road to Hornsey Road. Access to Holloway Road from Hornsey Road will be maintained (see drawing of the diversion route below).


Vehicle access to all properties west of Charles Street from Holloway Road will be maintained, but exit will only be possible via Holloway Road. A signed diversion will be in place. The diversion will be via Holloway Road, Tollington Way and Hornsey Road.


To allow us to carry out the works as quickly and as efficiently as possible, we will be introducing temporary parking restrictions on Fairbridge Road. These restrictions will be kept to a minimum and we will ensure that signs are put up well in advance to give residents as much notice as possible of any restrictions.


We will make every effort to keep any disruption and noise to a minimum. The contractor’s actual work times may vary depending on the nature of the works and the weather conditions. We do not have any plans to work outside of the above permitted working hours.


If you would like more information, on the improvements we are making in your area, please email environment@islington.gov.uk. Alternatively, you can call 0207 527 2000, or write to us at the address below.


Environment

Climate Change & Transport

Islington Council

PO Box 2025

Pershore

WR10 9BU






Photographs of the completed scheme



Picture of scheme looking north-east on Fairbridge Road




Picture of scheme looking south-west on Fairbridge Road







Share Final report on Facebook Share Final report on Twitter Share Final report on Linkedin Email Final report link
<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>