Harvist Estate - help us bring some colour to your new and improved playspaces!

Share Harvist Estate - help us bring some colour to your new and improved playspaces! on Facebook Share Harvist Estate - help us bring some colour to your new and improved playspaces! on X (formerly Twitter) Share Harvist Estate - help us bring some colour to your new and improved playspaces! on Linkedin Email Harvist Estate - help us bring some colour to your new and improved playspaces! link

This survey is now closed and the results have been posted at the bottom of this page. 

Working with your local councillors to transform the play spaces on Harvist Estate

As part of wider changes at Harvist Estate, we have renewed the play spaces available to residents. There is great new play equipment, benches, colourful surfacing, and better accessibility for everyone.

The play spaces have been enlarged and great, new play equipment, benches, colourful surfacing, have been installed to replace the existing.

The play spaces have been designed for two different age-groups: Toddlers (ages 0-5) and Juniors (ages 6-12).

Both areas provide the maximum range of physical activity (e.g. climbing, spinning, rocking) within the space we have. The spaces are still bounded by safety fencing.

Completed photos


Toddler Playspace

Drawing showing the layout of the proposed toddler playspace

The toddler playspace includes

  • 1: Swing with one flat seat and one cradle seat
  • 2: Junior spica
  • 3: Daisy springer
  • 4: Multi deck play tower
  • 5: Park bench with backrest
  • PF: Playground fencing extended. Existing fence cleaned and painted.
  • WP: Outdoor impact-absorbing surfacing

Junior Playspace

Drawing showing the layout of the proposed junior playspace


The junior playspace includes:

  • 1: Supernova Unique carousel
  • 2: Emerald climbing net
  • 3: Nest swing
  • 4: Park bench with backrest
  • PF: Playground fencing extended. Existing fence cleaned and painted.
  • WP: Outdoor impact-absorbing surfacing

Drop-in session on 2 October 2025

In October 2025 we held a drop-in session, where residents could find out about the proposed improvements. Light refreshments and colouring activities were on offer!

When: 3pm - 6pm, Thursday 2 October 2025

Where: Play Space next to Everett House and the football pitch

Colour schemes survey

From 8th September to 5th October 2025 we held a survey which gave residents the opportunity to input on the colour scheme of the play spaces. 

Working with your local councillors to transform the play spaces on Harvist Estate

As part of wider changes at Harvist Estate, we have renewed the play spaces available to residents. There is great new play equipment, benches, colourful surfacing, and better accessibility for everyone.

The play spaces have been enlarged and great, new play equipment, benches, colourful surfacing, have been installed to replace the existing.

The play spaces have been designed for two different age-groups: Toddlers (ages 0-5) and Juniors (ages 6-12).

Both areas provide the maximum range of physical activity (e.g. climbing, spinning, rocking) within the space we have. The spaces are still bounded by safety fencing.

Completed photos


Toddler Playspace

Drawing showing the layout of the proposed toddler playspace

The toddler playspace includes

  • 1: Swing with one flat seat and one cradle seat
  • 2: Junior spica
  • 3: Daisy springer
  • 4: Multi deck play tower
  • 5: Park bench with backrest
  • PF: Playground fencing extended. Existing fence cleaned and painted.
  • WP: Outdoor impact-absorbing surfacing

Junior Playspace

Drawing showing the layout of the proposed junior playspace


The junior playspace includes:

  • 1: Supernova Unique carousel
  • 2: Emerald climbing net
  • 3: Nest swing
  • 4: Park bench with backrest
  • PF: Playground fencing extended. Existing fence cleaned and painted.
  • WP: Outdoor impact-absorbing surfacing

Drop-in session on 2 October 2025

In October 2025 we held a drop-in session, where residents could find out about the proposed improvements. Light refreshments and colouring activities were on offer!

When: 3pm - 6pm, Thursday 2 October 2025

Where: Play Space next to Everett House and the football pitch

Colour schemes survey

From 8th September to 5th October 2025 we held a survey which gave residents the opportunity to input on the colour scheme of the play spaces. 

This survey is now closed and the results have been posted at the bottom of this page. 

  • Results

    Share Results on Facebook Share Results on X (formerly Twitter) Share Results on Linkedin Email Results link

    Thank you to everyone who responded to our survey. We have tallied up responses and the following colour schemes were chosen:

    Playground A: Junior

    Red colour scheme

    Playground B: Toddler

    Blue colour scheme


    NEXT STEPS

    We will now proceed with installing the new playgrounds with the aim to begin in April 2026. Residents will receive a letter confirming the start date before works start.

    Thank you to everyone who responded to our survey. We have tallied up responses and the following colour schemes were chosen:

    Playground A: Junior

    Red colour scheme

    Playground B: Toddler

    Blue colour scheme


    NEXT STEPS

    We will now proceed with installing the new playgrounds with the aim to begin in April 2026. Residents will receive a letter confirming the start date before works start.

    This survey is now closed and the results have been posted at the bottom of this page.